Skip to content
Start a project PLEN
Back to the portfolio

Station 02 · Systems

Scheduling Generator

Building schedules around constraints and fair allocation of shifts.

Pilot
Diagram of shifts and scheduling rules
Scheduling process illustration

About the project

Manual scheduling must reconcile people’s availability with organisational rules.

Rules and constraints form the basis of automated scheduling.

A pilot project. We show the approach without claiming unverified time savings.

Status

Pilot

A pilot in real conditions.

We publish numbers and results only after verification. We never show invented metrics or screenshots that do not exist.

In the Catalogue

Want something similar? This is how that work looks in our Catalogue.

Related

At the same station

Have a similar problem?

Let’s not start with a tool. Let’s start with a problem worth solving.

HIMAWARI / START

Let’s start with the problem.

Four short steps. No sales deck and no guessing the solution before diagnosis.

  1. 01 DIRECTION
  2. 02 PAIN
  3. 03 PROBLEM
  4. 04 CONTACT
What do you want to change?

The interactive part did not start. All content remains available. Reload the page to start the project form.

Reload the page